Trapezoidal Reinforced Earth® MSE Retaining Walls
MSE walls can be built with a variation of soil reinforcement lengths vertically in one section. This is called a trapezoidal MSE wall section, and is outlined in the FHWA guidelines.
AASHTO 11.10.2.1 discusses shortening bottom strips to 0.4H minimum provided the wall is founded on rock or very competent foundation soil.



Among other design criteria in FHWA NHI-10-024 for trapezoidal MSE walls, geometrically the minimum base length (L3) is 0.4H or 8 feet, whichever is greater. The difference in length between each step or zone must be 0.15H or less.
Benefits Trapezoidal Reinforced Earth Design:
- Utilized for applications with base width restrictions that preclude the use of conventional MSE.
- Simple design guidance is found in FHWA-NHI-10-024.
- Ideal for steep, mountainous and rugged terrain applications.
- Can be integrated with adjacent conventional MSE walls and other structures.
TechWall™ Retaining Walls for Uchumayo Motorway
y8Zd8OTYSc
2019-12-10 15:10:44
TechWall™ Retaining Walls for Uchumayo Motorway
Reinforced Earth® Walls for Ramps and Abutments at Clark Airport
y8Zd8OTYSc
2020-03-05 10:41:55
Reinforced Earth® Walls for Ramps and Abutments at Clark Airport
Fort Lauderdale-Hollywood Airport Runway Expansion
y8Zd8OTYSc
2025-04-18 20:17:22
Fort Lauderdale-Hollywood Airport Runway Expansion
Reinforced Earth® Retaining Walls for Cinta Costera Seafront
y8Zd8OTYSc
2019-11-18 13:34:22
Reinforced Earth® Retaining Walls for Cinta Costera Seafront
Seattle-Tacoma International Airport Third Runway
y8Zd8OTYSc
2025-04-18 18:51:49
Seattle-Tacoma International Airport Third Runway
Reinforced Earth® Walls for Las Tórtolas Tailings Dam
y8Zd8OTYSc
2019-12-10 10:48:25
Reinforced Earth® Walls for Las Tórtolas Tailings Dam
TechWall™ Retaining Walls for Pedestrian Crossing
y8Zd8OTYSc
2019-12-09 23:54:23
TechWall™ Retaining Walls for Pedestrian Crossing
TechSpan® and Reinforced Earth® for complex road project
y8Zd8OTYSc
2019-12-10 14:52:10
TechSpan® and Reinforced Earth® for complex road project
Approach Road, True Abutment for Mactan-Cebu Airport
y8Zd8OTYSc
2019-11-18 13:34:53
Approach Road, True Abutment for Mactan-Cebu Airport
Reinforced Earth® Access Ramps for Dakar Express Railway
y8Zd8OTYSc
2019-12-10 15:05:36
Reinforced Earth® Access Ramps for Dakar Express Railway
Reinforced Earth® Walls for Las Tórtolas Tailings Dam
y8Zd8OTYSc
2021-07-07 10:23:28
Reinforced Earth® Walls for Las Tórtolas Tailings Dam
Moroccan Power Station receives upgrade
y8Zd8OTYSc
2020-02-21 10:22:53
Moroccan Power Station receives upgrade
Reinforced Earth® Walls for Highway 407 East Phase 2
y8Zd8OTYSc
2019-11-18 13:33:56
Reinforced Earth® Walls for Highway 407 East Phase 2
Mercedes-Benz Stadium Northside Drive Pedestrian Bridge
y8Zd8OTYSc
2025-04-18 19:58:31
Mercedes-Benz Stadium Northside Drive Pedestrian Bridge
Geoquest® Retaining Walls for High-Speed Rail Line
y8Zd8OTYSc
2019-11-18 13:33:18
Geoquest® Retaining Walls for High-Speed Rail Line
Reinforced Earth® Walls for Las Tórtolas Tailings Dam
y8Zd8OTYSc
2019-12-10 10:48:25
Reinforced Earth® Walls for Las Tórtolas Tailings Dam
Approach Road, True Abutment for Mactan-Cebu Airport
y8Zd8OTYSc
2019-11-18 13:34:53
Approach Road, True Abutment for Mactan-Cebu Airport
Mercedes-Benz Stadium Northside Drive Pedestrian Bridge
y8Zd8OTYSc
2025-04-18 19:58:31
Mercedes-Benz Stadium Northside Drive Pedestrian Bridge
Moroccan Power Station receives upgrade
y8Zd8OTYSc
2020-02-21 10:22:53
Moroccan Power Station receives upgrade
Fort Lauderdale-Hollywood Airport Runway Expansion
y8Zd8OTYSc
2025-04-18 20:17:22
Fort Lauderdale-Hollywood Airport Runway Expansion
Seattle-Tacoma International Airport Third Runway
y8Zd8OTYSc
2025-04-18 18:51:49
Seattle-Tacoma International Airport Third Runway
Reinforced Earth® Walls for Ramps and Abutments at Clark Airport
y8Zd8OTYSc
2020-03-05 10:41:55
Reinforced Earth® Walls for Ramps and Abutments at Clark Airport
Reinforced Earth® Walls for Las Tórtolas Tailings Dam
y8Zd8OTYSc
2021-07-07 10:23:28
Reinforced Earth® Walls for Las Tórtolas Tailings Dam
Reinforced Earth® Access Ramps for Dakar Express Railway
y8Zd8OTYSc
2019-12-10 15:05:36
Reinforced Earth® Access Ramps for Dakar Express Railway
Reinforced Earth® Walls for Highway 407 East Phase 2
y8Zd8OTYSc
2019-11-18 13:33:56
Reinforced Earth® Walls for Highway 407 East Phase 2
TechWall™ Retaining Walls for Uchumayo Motorway
y8Zd8OTYSc
2019-12-10 15:10:44
TechWall™ Retaining Walls for Uchumayo Motorway
Reinforced Earth® Retaining Walls for Cinta Costera Seafront
y8Zd8OTYSc
2019-11-18 13:34:22
Reinforced Earth® Retaining Walls for Cinta Costera Seafront
TechSpan® and Reinforced Earth® for complex road project
y8Zd8OTYSc
2019-12-10 14:52:10
TechSpan® and Reinforced Earth® for complex road project
TechWall™ Retaining Walls for Pedestrian Crossing
y8Zd8OTYSc
2019-12-09 23:54:23
TechWall™ Retaining Walls for Pedestrian Crossing
Geoquest® Retaining Walls for High-Speed Rail Line
y8Zd8OTYSc
2019-11-18 13:33:18
Geoquest® Retaining Walls for High-Speed Rail Line
Reinforced Earth® Walls for Las Tórtolas Tailings Dam
y8Zd8OTYSc
2019-12-10 10:48:25
Reinforced Earth® Walls for Las Tórtolas Tailings Dam
Moroccan Power Station receives upgrade
y8Zd8OTYSc
2020-02-21 10:22:53
Moroccan Power Station receives upgrade
TechSpan® and Reinforced Earth® for complex road project
y8Zd8OTYSc
2019-12-10 14:52:10
TechSpan® and Reinforced Earth® for complex road project
TechWall™ Retaining Walls for Pedestrian Crossing
y8Zd8OTYSc
2019-12-09 23:54:23
TechWall™ Retaining Walls for Pedestrian Crossing
Reinforced Earth® Walls for Las Tórtolas Tailings Dam
y8Zd8OTYSc
2021-07-07 10:23:28
Reinforced Earth® Walls for Las Tórtolas Tailings Dam
Reinforced Earth® Walls for Highway 407 East Phase 2
y8Zd8OTYSc
2019-11-18 13:33:56
Reinforced Earth® Walls for Highway 407 East Phase 2
TechWall™ Retaining Walls for Uchumayo Motorway
y8Zd8OTYSc
2019-12-10 15:10:44
TechWall™ Retaining Walls for Uchumayo Motorway
Mercedes-Benz Stadium Northside Drive Pedestrian Bridge
y8Zd8OTYSc
2025-04-18 19:58:31
Mercedes-Benz Stadium Northside Drive Pedestrian Bridge
Fort Lauderdale-Hollywood Airport Runway Expansion
y8Zd8OTYSc
2025-04-18 20:17:22
Fort Lauderdale-Hollywood Airport Runway Expansion
Seattle-Tacoma International Airport Third Runway
y8Zd8OTYSc
2025-04-18 18:51:49
Seattle-Tacoma International Airport Third Runway
Reinforced Earth® Access Ramps for Dakar Express Railway
y8Zd8OTYSc
2019-12-10 15:05:36
Reinforced Earth® Access Ramps for Dakar Express Railway
Reinforced Earth® Walls for Ramps and Abutments at Clark Airport
y8Zd8OTYSc
2020-03-05 10:41:55
Reinforced Earth® Walls for Ramps and Abutments at Clark Airport
Reinforced Earth® Retaining Walls for Cinta Costera Seafront
y8Zd8OTYSc
2019-11-18 13:34:22
Reinforced Earth® Retaining Walls for Cinta Costera Seafront
Approach Road, True Abutment for Mactan-Cebu Airport
y8Zd8OTYSc
2019-11-18 13:34:53