ArmaGreen® Reinforced Soil Slopes
Vegetated facing for steep slopes
Built as earth retaining structures, slopes are constructed to an angle to horizontal typically between 45° and 76°. These reinforced soil structures are commonly referred to by engineers as Reinforced Soil Slopes (RSS) or Geosynthetic Reinforced Slopes (GRS). Geoquest’s success in this field has led to solutions that have reached a world record-setting RSS structure being built to a height exceeding 100m.
ArmaGreen is an engineered solution for reinforced soil slopes that allow for promotion of natural vegetation. The solution allows the reinforced soil slope to be integrated with surrounding live landscaping.


Applications
Steep slopes are used for a variety of applications such as:
- Earth retaining structures
- Platform support
- Slope rehabilitation
- Gravitational risk protection (rockfall, landslides, avalanches)
- Protective bunds (sight barriers, explosion and assault barriers, sight and noise barriers)
- Flood levees and dikes
- Landfills
Benefits of ArmaGreen Reinforced Soil Slopes:
- Durability
- Design flexibility
- Accommodate vegetation
Moroccan Power Station receives upgrade
y8Zd8OTYSc
2020-02-21 10:22:53
Moroccan Power Station receives upgrade
TechSpan® and Reinforced Earth® for complex road project
y8Zd8OTYSc
2019-12-10 14:52:10
TechSpan® and Reinforced Earth® for complex road project
Reinforced Earth® Walls for Ramps and Abutments at Clark Airport
y8Zd8OTYSc
2020-03-05 10:41:55
Reinforced Earth® Walls for Ramps and Abutments at Clark Airport
Reinforced Earth® Walls for Highway 407 East Phase 2
y8Zd8OTYSc
2019-11-18 13:33:56
Reinforced Earth® Walls for Highway 407 East Phase 2
Approach Road, True Abutment for Mactan-Cebu Airport
y8Zd8OTYSc
2019-11-18 13:34:53
Approach Road, True Abutment for Mactan-Cebu Airport
Mercedes-Benz Stadium Northside Drive Pedestrian Bridge
y8Zd8OTYSc
2025-04-18 19:58:31
Mercedes-Benz Stadium Northside Drive Pedestrian Bridge
Seattle-Tacoma International Airport Third Runway
y8Zd8OTYSc
2025-04-18 18:51:49
Seattle-Tacoma International Airport Third Runway
Fort Lauderdale-Hollywood Airport Runway Expansion
y8Zd8OTYSc
2025-04-18 20:17:22
Fort Lauderdale-Hollywood Airport Runway Expansion
Reinforced Earth® Retaining Walls for Cinta Costera Seafront
y8Zd8OTYSc
2019-11-18 13:34:22
Reinforced Earth® Retaining Walls for Cinta Costera Seafront
Reinforced Earth® Walls for Las Tórtolas Tailings Dam
y8Zd8OTYSc
2021-07-07 10:23:28
Reinforced Earth® Walls for Las Tórtolas Tailings Dam
TechWall™ Retaining Walls for Uchumayo Motorway
y8Zd8OTYSc
2019-12-10 15:10:44
TechWall™ Retaining Walls for Uchumayo Motorway
Reinforced Earth® Walls for Las Tórtolas Tailings Dam
y8Zd8OTYSc
2019-12-10 10:48:25
Reinforced Earth® Walls for Las Tórtolas Tailings Dam
TechWall™ Retaining Walls for Pedestrian Crossing
y8Zd8OTYSc
2019-12-09 23:54:23
TechWall™ Retaining Walls for Pedestrian Crossing
Reinforced Earth® Access Ramps for Dakar Express Railway
y8Zd8OTYSc
2019-12-10 15:05:36
Reinforced Earth® Access Ramps for Dakar Express Railway
Reinforced Earth® Walls for Las Tórtolas Tailings Dam
y8Zd8OTYSc
2019-12-10 10:48:25
Reinforced Earth® Walls for Las Tórtolas Tailings Dam
Mercedes-Benz Stadium Northside Drive Pedestrian Bridge
y8Zd8OTYSc
2025-04-18 19:58:31
Mercedes-Benz Stadium Northside Drive Pedestrian Bridge
Seattle-Tacoma International Airport Third Runway
y8Zd8OTYSc
2025-04-18 18:51:49
Seattle-Tacoma International Airport Third Runway
Fort Lauderdale-Hollywood Airport Runway Expansion
y8Zd8OTYSc
2025-04-18 20:17:22
Fort Lauderdale-Hollywood Airport Runway Expansion
Reinforced Earth® Walls for Ramps and Abutments at Clark Airport
y8Zd8OTYSc
2020-03-05 10:41:55
Reinforced Earth® Walls for Ramps and Abutments at Clark Airport
Reinforced Earth® Access Ramps for Dakar Express Railway
y8Zd8OTYSc
2019-12-10 15:05:36
Reinforced Earth® Access Ramps for Dakar Express Railway
TechWall™ Retaining Walls for Uchumayo Motorway
y8Zd8OTYSc
2019-12-10 15:10:44
TechWall™ Retaining Walls for Uchumayo Motorway
Reinforced Earth® Walls for Las Tórtolas Tailings Dam
y8Zd8OTYSc
2021-07-07 10:23:28
Reinforced Earth® Walls for Las Tórtolas Tailings Dam
Approach Road, True Abutment for Mactan-Cebu Airport
y8Zd8OTYSc
2019-11-18 13:34:53
Approach Road, True Abutment for Mactan-Cebu Airport
Moroccan Power Station receives upgrade
y8Zd8OTYSc
2020-02-21 10:22:53
Moroccan Power Station receives upgrade
Reinforced Earth® Walls for Highway 407 East Phase 2
y8Zd8OTYSc
2019-11-18 13:33:56
Reinforced Earth® Walls for Highway 407 East Phase 2
TechWall™ Retaining Walls for Pedestrian Crossing
y8Zd8OTYSc
2019-12-09 23:54:23
TechWall™ Retaining Walls for Pedestrian Crossing
TechSpan® and Reinforced Earth® for complex road project
y8Zd8OTYSc
2019-12-10 14:52:10
TechSpan® and Reinforced Earth® for complex road project
Reinforced Earth® Retaining Walls for Cinta Costera Seafront
y8Zd8OTYSc
2019-11-18 13:34:22
Reinforced Earth® Retaining Walls for Cinta Costera Seafront
Fort Lauderdale-Hollywood Airport Runway Expansion
y8Zd8OTYSc
2025-04-18 20:17:22
Fort Lauderdale-Hollywood Airport Runway Expansion
Approach Road, True Abutment for Mactan-Cebu Airport
y8Zd8OTYSc
2019-11-18 13:34:53
Approach Road, True Abutment for Mactan-Cebu Airport
Moroccan Power Station receives upgrade
y8Zd8OTYSc
2020-02-21 10:22:53
Moroccan Power Station receives upgrade
Reinforced Earth® Retaining Walls for Cinta Costera Seafront
y8Zd8OTYSc
2019-11-18 13:34:22
Reinforced Earth® Retaining Walls for Cinta Costera Seafront
Geoquest® Retaining Walls for High-Speed Rail Line
y8Zd8OTYSc
2019-11-18 13:33:18
Geoquest® Retaining Walls for High-Speed Rail Line
TechSpan® and Reinforced Earth® for complex road project
y8Zd8OTYSc
2019-12-10 14:52:10
TechSpan® and Reinforced Earth® for complex road project
Reinforced Earth® Walls for Las Tórtolas Tailings Dam
y8Zd8OTYSc
2021-07-07 10:23:28
Reinforced Earth® Walls for Las Tórtolas Tailings Dam
Reinforced Earth® Walls for Las Tórtolas Tailings Dam
y8Zd8OTYSc
2019-12-10 10:48:25
Reinforced Earth® Walls for Las Tórtolas Tailings Dam
Reinforced Earth® Access Ramps for Dakar Express Railway
y8Zd8OTYSc
2019-12-10 15:05:36
Reinforced Earth® Access Ramps for Dakar Express Railway
TechWall™ Retaining Walls for Uchumayo Motorway
y8Zd8OTYSc
2019-12-10 15:10:44
TechWall™ Retaining Walls for Uchumayo Motorway
Reinforced Earth® Walls for Highway 407 East Phase 2
y8Zd8OTYSc
2019-11-18 13:33:56
Reinforced Earth® Walls for Highway 407 East Phase 2
Seattle-Tacoma International Airport Third Runway
y8Zd8OTYSc
2025-04-18 18:51:49
Seattle-Tacoma International Airport Third Runway
Reinforced Earth® Walls for Ramps and Abutments at Clark Airport
y8Zd8OTYSc
2020-03-05 10:41:55
Reinforced Earth® Walls for Ramps and Abutments at Clark Airport
TechWall™ Retaining Walls for Pedestrian Crossing
y8Zd8OTYSc
2019-12-09 23:54:23
TechWall™ Retaining Walls for Pedestrian Crossing
Mercedes-Benz Stadium Northside Drive Pedestrian Bridge
y8Zd8OTYSc
2025-04-18 19:58:31